101 Castro Way, Derrimut

Our firm was engaged by 2CONSTRUCT to provide a passive fire solution design for a substantial warehouse.

Project Details

Services

  • Fire Retardant Board
  • Fire Stopping Penetrations
  • Vermiculite Fire Spray

Industry

Logistics

Client

2CONSTRUCT

The Project

This $1.3 million construction of a 17,140m2 5-Star Green star high clearance warehouse and office facility in Derrimut required large-scale passive fire treatment. The sheer size of the premises and various materials called for a multi-scope solution using a range of passive fire products.

The Problem

This massive commercial warehouse built by 2CONSTRUCT required a passive fire protection upgrade due to a lease changeover. Because the incoming tenant, LINFOX, needed to store dangerous goods within the warehouse, 2CONSTRUCT sought a provider who could install appropriate fire protection to contain the volatile materials. 

Image credits: 2CONSTRUCT

The Solution

PROFINISH Fire Protection helped design and build a large scale fire wall at Castro Way. This wall runs approximately 160 meters in length and spans 12 meters high. The wall, at over 1,250m2, was created with pre-cast concrete using Promatect H. We are also installing a massive 4,600m2 fire-shield plasterboard system throughout two of the four walls around the warehouse, completely stopped up, sanded and painted to a professional standard. We also treated and fire-stopped any service penetrations in the fire wall. 

Image credits: 2CONSTRUCT

Download the PROFINISH Capability Statement

We design and build projects that stop fire and corrosion, because no one should die in a fire.

Download our capability statement for information on our end-to-end fire protection. Learn more about our design, build and document process.

Enter your details to be sent a copy.

Services used in this project

Fire Retardant Board

Fire Stopping Penetrations

Vermiculite Fire Spray